Before You Fight the Next Data Center, Look at Your Phone

Why do we need data centers? An East Texas web designer explains what runs on them, where AI fits, and what to ask before one comes to Bowie County.

hand holding a smartphone showing banking, maps, photos and email apps, with rows of data center server racks in the background

I get why people show up to county meetings angry about data centers. A company buys a few hundred acres, the power company starts talking about new transmission lines, and somebody asks where all that water is coming from, not to mention, “Why do we need data centers, anyway?” Those are fair questions, and I’ll get to every one of them.

But most of the anger I hear lands on one thing: AI. Chatbots, ChatGPT, robots writing term papers. Get rid of AI and you get rid of the buildings. That story leaves out almost everything you and I do on a normal Tuesday.

I’ve built websites since 2007. Every one of them lives on a server inside a data center somewhere. So does your email, your bank balance, the pictures of your grandkids, and the chart your doctor pulls up when you walk into the exam room. AI is the newest tenant in these buildings. It moved into a place that was already full.

Why do we need data centers and what are they?

A data center is a big building full of computers called servers. They run 24 hours a day, every day, with cooling systems to keep them from overheating and backup generators so they never go dark. When anyone says “the cloud,” they mean somebody else’s computer sitting in one of these buildings.

Your phone does a lot less work than you think. Most of the time it’s a window. You tap something, a request flies off to a server, the server does the work, and the answer comes back in a fraction of a second.

One fair point before we go further. Not every gadget needs a data center, and not every data center runs AI. Some systems work right on the device. Some companies run their own private server rooms. Others rent space in giant cloud facilities. All of it adds to how much computing the country needs.

Look at how much changed in 20 years

Think back to 2005 and look at what we take for granted now:

  • We rarely write checks.
  • We deposit a check by taking a picture of it.
  • We expect a package to show up tomorrow, and we can see exactly where it is right now.
  • Stores change thousands of prices without anybody walking the aisles with a label gun.
  • Prescriptions go straight from the doctor’s office to the pharmacy.
  • We check whether a store has something in stock before we leave the house.
  • We pay at the pump without walking inside.
  • Our cars warn us about a wreck before we get to it.
  • We pull up 20 years of family photos from a phone.

Every one of those runs on digital systems, and most of them touch a data center somewhere along the way. Here’s what that looks like on a regular day.

Your inbox

The world sent and received about 376 billion emails a day in 2025, according to the Radicati Group. Every one of them sits on a server until somebody deletes it, and most people never delete anything.

I just moved a client’s mailbox with about 100,000 emails from one provider to another. Those messages never lived on her laptop. They lived in one data center, and now they live in a different one.

Your bank and your debit card

Mobile apps became the top way Americans manage their bank accounts years ago. In the American Bankers Association’s 2024 survey, 55% of customers named their phone app as their main way to bank. In 2025, baby boomers said the same thing for the first time.

Then there’s the card swipe. Visa says its network handles more than 322 billion transactions a year and can process up to 83,000 transaction messages per second. It runs on seven data centers, including a heavily guarded one in Ashburn, Virginia. When you pay at the pump in East Texas, the approval travels to one of those buildings and back before the receipt prints.

Movie night

Streaming one hour of video used about 0.077 kWh of electricity in 2019, by the International Energy Agency’s estimate. That’s tiny for one person on one evening.

Now multiply it. YouTube says creators upload 500 hours of video every minute. Every one of those videos gets stored, copied, and served to whoever wants to watch it, from servers sitting in data centers.

The photos on your phone

Google reported in May 2025 that Google Photos holds more than 9 trillion photos and videos for more than 1.5 billion monthly users. Apple’s iCloud does the same job for iPhone owners. When your phone says “backed up,” it means a data center has a copy of your daughter’s wedding.

Getting where you’re going

Google Maps passed 2 billion monthly users. The live traffic, the red line on the interstate, the “crash reported ahead” alert, all of it comes from servers crunching location data from millions of phones at once.

why do we need data centers - walmart digital pricing

Shopping

Online sales hit $340.2 billion in the second quarter of 2026, which is 17.1% of all U.S. retail sales, according to the Census Bureau. Every order touches inventory systems, payment systems, warehouse systems, and the tracking text that tells you your package is out for delivery.

The same goes for the stores you walk into. Self-checkout, digital coupons, the app that tells you aisle 14 has the paper towels, and the electronic shelf price that changed overnight all run on servers.

The doctor’s office

Epic, the biggest electronic health record company in the country, holds records for about 325 million people. Your appointment reminder, your patient portal, your lab results, and your prescription refill all depend on servers, and more hospitals move those systems to the cloud every year.

The small stuff nobody thinks about

  • Your church’s Sunday livestream
  • Your kids’ school grade portal
  • The doorbell camera clip on your phone
  • Your thermostat app
  • Filing your taxes online
  • Your Social Security account
  • The county’s property tax payment page
  • Every small business website you’ve ever bought from

None of that is AI. All of it needs a data center.

So where does AI fit in

I’m not going to pretend AI doesn’t matter here. It does. It’s the fastest-growing piece of the pie, and it’s behind most of the giant new campuses you see in the news.

But look at the actual numbers. The Department of Energy’s 2024 report from Lawrence Berkeley National Laboratory found U.S. data centers used about 176 terawatt-hours of electricity in 2023, or 4.4% of the country’s total. In 2014 they used 58 terawatt-hours. Most of that growth came from cloud services, streaming, and everything else on the list above, with AI servers ramping up after 2018.

AI-focused data centers are still the smaller share. Energy researcher Hannah Ritchie, working from the International Energy Agency’s 2025 numbers, estimates data centers use about 5% of U.S. electricity, with AI-focused ones at roughly 2%. Worldwide, regular data centers used more than twice as much power as AI-focused ones in 2025.

The same DOE report projects data centers could use 6.7% to 12% of U.S. electricity by 2028. AI is the main reason that number jumps. Our everyday habits are the reason the buildings existed in the first place, and the reason they’d still be here if every chatbot shut down tomorrow.

The concerns are real

None of this means you should shrug and let anybody build anything. People worried about data centers have good reasons.

Water. U.S. data centers used about 17 billion gallons of water directly for cooling in 2023, triple what they used in 2014, per the Lawrence Berkeley report. The power plants feeding them used roughly 211 billion more gallons. The Congressional Research Service found that about 97% of the water these facilities use comes from municipal systems, the same ones that fill your kitchen sink. The IEA estimates a single 100-megawatt data center can use as much water in a day as 2,600 households.

Power and your bill. New data centers need new power plants and new transmission lines. Somebody pays for those. If the deal isn’t written right, that somebody is you, in your monthly electric bill.

Texas specifically. ERCOT, the group that runs most of the Texas grid, is now looking at more than 474 gigawatts of requests to connect, and about 90% of them come from data centers. On August 3, 2026, Governor Abbott ordered the Public Utility Commission and ERCOT to audit every data center project in that line. A lot of those requests will never get built. ERCOT’s own people have said many of them are speculative. Texas also passed Senate Bill 6, which makes large customers pay a $100,000 interconnection fee and disclose duplicate requests.

Close to home. In August, Bowie County commissioners voted to sell 582 acres at Hooks to a data center developer for $12 million. The county and two local development corporations bought that land for about $1.5 million in 2020. The contract had a confidentiality clause, and the Hooks City Council said it was blindsided by the sale. In an interview with TXK Today, outgoing County Judge Bobby Howell was asked whether residents should have had a say. His answer: “In my opinion, no, because they have no expertise for the most part.” He says the project could add about $4.5 billion to the county tax roll. I disagree with him on the first part. You don’t need expertise to ask where the water is coming from or who pays for the power lines.

So yes, keep asking hard questions. Just aim them at the right target.

What I’d do if one is coming to my county

“No AI” won’t win a zoning fight, and it won’t get you a better deal. Specific questions will. Take these to the commissioners court or the city council meeting:

  1. What cooling system will it use? Air-cooled and closed-loop systems use far less water than evaporative cooling.
  2. Where does the water come from? Ask whether they’ll use reclaimed or treated wastewater instead of drinking water.
  3. Who pays for the new power lines and substations? Get it in writing that residential customers won’t carry that cost.
  4. What are the tax abatement terms, and how many permanent local jobs come with them?
  5. Will they report their water and power use publicly every year?
  6. What happens to the site if the company walks away?

A company that wants to be a good neighbor will answer every one of those. A company that dodges them is telling you something.

I use these buildings every single day, and so do you. The next time your phone buzzes with a bank alert or a package update, that buzz came from a data center. Make the ones near you play fair.

Sources

They hold and run almost everything you do online. Your email, bank account, card payments, photo backups, maps, online orders, and medical records all live on servers inside data centers. Your phone mostly sends requests to those servers and shows you the answer, often in a fraction of a second.

No. Data centers have been growing for over a decade because of cloud services, streaming, online shopping, and banking. AI is the fastest-growing piece right now and drives a lot of the newest large projects. If every chatbot shut down tomorrow, we’d still need most of the buildings already running.

U.S. data centers used about 4.4% of the country’s electricity in 2023, according to a Department of Energy report from Lawrence Berkeley National Laboratory. That’s up from 58 terawatt-hours in 2014 to 176 in 2023. The same report projects 6.7% to 12% by 2028, with AI as the main reason for the jump.

U.S. data centers used about 17 billion gallons of water for cooling in 2023, triple what they used in 2014. About 97% of it comes from city water systems. The International Energy Agency estimates a 100-megawatt data center can use as much water in a day as 2,600 households.

Yes. Every movie, show, and video you stream is stored on servers and sent to your screen from data centers. One hour of streaming uses a small amount of electricity for one person. Multiply that by millions of viewers and the 500 hours of video uploaded to YouTube every minute, and the demand adds up fast.

It can. New data centers often need new power plants, substations, and transmission lines. If the agreement with the utility isn’t written carefully, residential customers can end up sharing those costs. Ask your county or utility, in writing, who pays for the new infrastructure before a project gets approved.

Ask what cooling system it will use, whether it will use reclaimed water instead of drinking water, and who pays for new power lines. Ask about tax abatements and permanent local jobs, whether they’ll report water and power use every year, and what happens to the site if the company leaves.

In Texas, a nondisclosure agreement doesn’t let a county hide public records. Start by sending a written Public Information Act request for the NDA, the tax abatement agreement, and emails with the developer.

If the county doesn’t respond within 10 business days, file a complaint with the Texas Attorney General’s Open Records Division, or call the Open Government Hotline at (877) 673-6839. If you think decisions were made outside a public meeting, report it to your county attorney or district attorney. The Freedom of Information Foundation of Texas offers free help at (800) 580-6651.